Skip to main content

Worldwide Shipping · Secure Payments

At a glance

Made by DWALRAFT, this tools, industrial & scientific is a good fit for workshops and professional users.

Key Highlights

  • Small and easy to carry or mount

Ideal For

  • Room or desk lighting
  • Workbench lighting
  • Outdoor use

Buying Tip

Compare the pin layout and operating voltage with your circuit, and order a spare or two: small parts are easy to damage while soldering.

Overview

The DWALRAFT for DEWALT Right Angle LED Attachment Up To 3 Hours Runtime Impact Tool Forged Gears Compact Lighting Tight Spaces Professional Grade, made by DWALRAFT, is listed in our tools, industrial & scientific range and suits workshops and professional users. The notes below explain the main specifications and what to check before you order.

Before you order

Compare the specifications with your project or device, and check delivery times and return terms for your country in our help centre. Questions about this item? Email [email protected] with the product code.

Specifications:
Model: DWALRAFT Right Angle LED Attachment
LED Runtime: Up to 3 hours on a full charge
Gear Material: Forged gears designed for extended longevity
LED Technology: Integrated onboard LED for precision lighting
Attachment Compatibility: Impact design with versatile adaptability
Construction: Crafted for professional-grade performance

Features:
Enhanced Visibility in Confined Spaces: The integrated onboard LED provides bright and focused illumination, optimizing precision lighting in hard-to-see areas. Perfect for cramped or low-light working conditions.
Impact Design: Engineered to handle tough tasks, the attachment seamlessly integrates with impact drivers, maintaining consistent and reliable performance in demanding environments.
Extended Gear Lifespan: Featuring forged gears that deliver up to 10X longer life*, this attachment ensures sustained operation even under rigorous use, making it ideal for intensive projects.
Prolonged Runtime: Powered to deliver up to 3 hours of continuous LED runtime†, this tool keeps you productive without frequent interruptions for recharging.
Compact and Ergonomic Build: Designed with a slim profile, the right-angle attachment facilitates effortless maneuverability and space optimization, helping users handle intricate tasks with ease.

Package Included:
1 x DWALRAFT Right Angle LED Attachment



Product Safety Information